Electronics Testing

On Thursday I was able to get in to the electronics labs and test the connections of the Kaoss Pad. I used an oscilloscope to test the voltages of each of the six connections under a variety of conditions.

These conditions were:
  • Hold button OFF without using the touch pad
  • Hold button ON, X and Y on pad set to 1,1
  • Hold button ON, X and Y on pad set to 9,1
  • Hold button ON, X and Y on pad set to 1,9
  • Hold button ON, X and Y on pad set to 9,9
  • Hold button ON, X and Y on pad set to 5,5
  • Hold button held down
  • When touching the touch pad with hold button ON and OFF 
Through this I learned that, as expected, a constant signal runs on every connection at all times. This is 6V peak-to-peak on all but one of the channels with a time period of 20ms. When the hold button is pressed down, the voltage is raised to 8V which causes the hold function to switch between the on and off states.

Standard waveform when XY pad is not touched.

All of the recorded values shown below were taken at the guitar end of the connection, though these were checked and found to be the same as at the Kaoss pad end and so only one set was written down. This suggests that the serial cable has no noticeable effect on the signal.




Results page 1

Results page 2

It was also shown that when the touch pad is used, regularly spaced spikes appear in the waveform. They are approximately 0.2ms wide in total and about 2V high. Their shape is changed depending on the position of the finger on the pad. This variation controls the stored parameters of the KP unit.

Additional notes




Thursday, 15 March 2012

User Testing

I have just completed a user testing session with 7 participants. Each was given five to ten minutes to play the guitar and then asked to complete a short questionnaire about their usual playing habits and their thoughts about different aspects of the guitar.

I will be using this information as well as that of any additional participants in the evaluation of the finished guitar.

The questionnaire that was completed can be found here.

Sunday, 11 March 2012

User Testing - Studio Booked

The studio has been booked for an hour on Thursday the 15th of March for User Testing. If further feedback is required then I will book a second session as soon as possible.

I also hope to access the electronics labs over the coming week to test the connections to the kaoss pad.